Exact Source
Exact Source / Planning resources

Leak detection · practical planning

A repair verification record for leak detection findings

A repair record is most useful when it explains what was repaired and what the subsequent check actually covered. This worksheet helps you organise the professional handover without converting a local finding into a guarantee about every pipe in the property.

Keep the finding, repair and check separate

Use three distinct entries: the defect identified, the work undertaken and the verification recorded afterwards. Identify the pipe or component with a location reference that another person can understand. Attach the contractor’s description rather than translating a technical term into a broader claim. Ask for clarification if the repaired section is not named.

The professional should choose suitable verification for the work and system. Record the stated conditions, result and limitations. Do not run your own pressure test or alter valves to fill a missing field. Water Regs UK’s pipework guidance explains the importance of watertight, suitable installations; this customer record is not an installation certificate.

Worked illustration: a limited check needs a limited conclusion

This fictional handover exercise is illustrative and contains no test measurements or claimed customer outcome. Suppose a repair instruction concerns a kitchen cold-water branch, while an upstairs mark is also mentioned. The owner receives a brief “checked after repair” note. The record below shows what to request before expanding that statement.

Record itemIllustrative entry
Agreed repair areaKitchen cold-water branch; precise component description requested.
Verification note“Checked after repair”; method, boundary and conditions awaiting clarification.
Separate observationUpstairs mark reported; relationship to the branch not established.
Appropriate conclusionAwait the professional report; do not describe all property pipework as certified.

Make outstanding actions visible

Put unresolved findings beside the relevant section, with a named contact and the next requested response. “Not assessed” and “no defect identified during the stated check” mean different things. Keep both distinct from a confirmed source repair. An accessible check cannot explain concealed areas outside its recorded scope simply because they share the same building.

Track any drying assessment and reinstatement separately. Allianz’s escape-of-water guidance describes these as distinct claim stages, subject to the property and policy. A plumbing handover does not itself establish that finishes are ready to close. Retain the report, relevant photographs and later correspondence as one dated record.

Your working record

Repair and verification worksheet

Transcribe confirmed professional information. Use “awaiting clarification” wherever the report does not supply an answer.

Your entries stay in this page until you choose to copy, download or print them. They are not sent to us or saved after you leave. Avoid recording other people’s private details.

Further reading