A water-company visit and a private leak investigation may assess different pipe sections and answer different questions. Leak detection in Dorking should record who inspected which boundary, what apparatus they controlled and which action remains with the property owner, without assuming that one attendance clears the other’s system.
Map the responsibility framework
Identify meter, boundary, communication pipe, private supply pipe and any shared branch using Ofwat and water-company information. Mark uncertainty. Physical location and ownership are related but not identical, particularly where several properties are served.
Do not operate company apparatus or state that the company owns a pipe solely from its appearance. Record the source and date of each responsibility statement.
Separate each attendance
For the water-company visit, retain its reference, date, findings and action. For the private contractor, define the instructed boundary, methods, access and report. Do not merge two differently conditioned tests into one conclusion.
If one party asks the other to act, record the exact referral. ‘Contact your plumber’ does not establish a private defect, while ‘no network leak found’ may not assess every private branch.
Coordinate site work
Before isolation or excavation, agree who authorises land access, controls water and checks buried services. If company equipment or records are needed, obtain that input. A private contractor should not improvise around a missing authority.
Set stop criteria at the responsibility boundary. If the exposed route differs, protect the area and reassess instead of extending onto another party’s apparatus.
Close with a shared evidence table
List pipe section, inspecting party, conditions, result, open action and owner. Attach photographs and references without unnecessary account data. After repair, record the confirmed pipe and verification.
A role table prevents the customer being sent repeatedly between organisations and preserves the factual boundary for a supplier, insurer or future contractor without making unsupported legal conclusions. Add the contact reference, response date and exact section assessed for every organisation. If the water company or contractor later changes its view, issue a dated update and identify which action is affected. Close referrals only when a named party accepts them or explains why they do not apply, rather than recording ‘passed back’ as a completed outcome. Record any planned attendance window, access condition and evidence the next party requested, so the customer can prepare once rather than restarting the explanation.
Further reading
Prepared with AI assistance using the sources listed above. General information cannot diagnose an individual property. Contact us to discuss your circumstances.
Would you like to talk it through?
Tell us what you have noticed and request a callback for further information.
Speak to a specialist