Leak detection in Sandhurst: how should evidence continue after a water meter is replaced?

Exact Source · 12 November 2026 · 2 min read

A replacement meter breaks the apparent continuity of readings even when the supply pipe remains unchanged. During leak detection in Sandhurst, the old and new devices must be identified separately, with final and opening readings, units and replacement time. A graph should not join them as though one instrument ran continuously.

Close the old meter record

Photograph the serial number, final display and unit where access and authority allow. Record the time, known water use and whether the supplier or another authorised party removed the device. Do not infer the final figure from a later bill when a direct reading exists.

Preserve the earlier investigation timeline and note any portal delay. Supplier data may be allocated to intervals rather than the exact replacement moment. An unexplained difference between billed and physical readings is a metering question, not automatic evidence of a hidden leak.

Validate the new starting point

Record the new serial number, opening reading, unit and installation reference. Confirm which property or shared supply it serves through reliable records or a controlled observation. The nearest meter is not necessarily the correct one in a divided or altered building.

Allow for commissioning use, flushing or other recorded activity before selecting a quiet-period baseline. Exact Source’s high-bill guide at https://exactsource.co.uk/advice/high-bill-first-questions/ can help the homeowner separate ordinary consumption questions from the technical leak investigation.

Compare rates, not raw totals

Use comparable intervals and known operating conditions. The new meter may display a different decimal format or resolution, so retain units and calculation steps. Do not claim that a smaller-looking number proves improvement until the scales have been reconciled.

For leak detection in Sandhurst, a documented meter change allows the post-repair record to continue without false precision. If consumption remains unusual, reopen the relevant supply or usage proposition using the new baseline. The old device’s evidence remains valid for its period and should not be rewritten to match the replacement.

If the supplier later corrects the opening or closing reading, add that notice to the timeline and recalculate only the affected interval. Do not edit photographs or field notes to make them agree. Record whether a leak allowance, billing query or account decision remains open, while keeping those administrative outcomes separate from the technical conclusion about the private supply. Confirm the new meter’s serial number again at the first post-repair review and record any portal label that differs from the physical device.

Further reading

Prepared with AI assistance using the sources listed above. General information cannot diagnose an individual property. Contact us to discuss your circumstances.